01One team, complete steelwork package
The delivery covered surface preparation, primer and intumescent fire protection, avoiding a gap between separate blasting and coating scopes.
02Abrasive blasting from elevated access
The existing steelwork was abrasive blasted from elevated access equipment to prepare it for protection.
03Primer applied straight after preparation
As each area was prepared, primer was applied immediately to protect the prepared steel from contamination or deterioration before the next stage.
04Intumescent fire protection applied in sequence
Intumescent fire-protective paint followed as part of the same coordinated delivery, maintaining continuous progress and reducing unnecessary handovers.